Technical information · Trade desk
Plans, capacities, access, operating conditions and contingencies — verified against the project before they become commitments.
Single source of truth
Facts before reassurance.
If we know, we tell you. If we need to verify, we say so. If something is not right for the project, we tell you that too.
- Verified
- We do not equate the current venue record with a promise.
- Dated
- Every technical issue carries a revision date.
- Brief-specific
- Configuration and access are checked for your project.
Floor plan preview
A working space for real drawings.
This page is ready for approved dimensioned plans. Until those drawings are supplied and verified, no decorative placeholder is presented as technical fact.
Drawing status: awaiting verified source files
Illustrative window only. Approved PDF/DWG drawings, dimensions and revision history will replace this frame.
What we verify.
Event capacity is not inferred from restaurant covers or ordinary operating capacity. It is confirmed by exact layout, service format and production scope.
Movement is part of the design
The short route is not always the simple route.
Two guests attending the same wedding may need two different ways to arrive. A sea route may be beautiful, or conditions may ask for another one. We document the guest journey, decision timing and fallback before the day.
One pack. Current answers.
The live page shows document status. The requested pack contains the controlled working files appropriate to the selected places and brief.
-
FP-01
Dimensioned floor plans
Measured drawings, usable areas and fixed elements.
-
CAP-02
Capacity schedules
Seated, standing and ceremony formats by zone.
-
ACC-03
Access & movement
Guest, supplier, land and sea arrival routes.
-
OPS-04
Operating notes
Timing, service, sound, utilities and decision points.
Request trade access
Tell us the project. We will verify the place.
Include date, approximate guest count, format and the places you are considering.